{"id":39063,"date":"2025-10-27T11:08:52","date_gmt":"2025-10-27T10:08:52","guid":{"rendered":"https:\/\/nr.stage.dekodes.no\/en\/?post_type=bc_project&#038;p=39063"},"modified":"2025-10-28T09:24:27","modified_gmt":"2025-10-28T08:24:27","slug":"predikering-av-vannforing-for-sma-vannkraftverk","status":"publish","type":"bc_project","link":"https:\/\/nr.stage.dekodes.no\/en\/projects\/predikering-av-vannforing-for-sma-vannkraftverk\/","title":{"rendered":"Streamflow prediction for smallscale hydropower plants"},"content":{"rendered":"\n<div class=\"wp-block-columns is-layout-flex wp-container-core-columns-is-layout-28f84493 wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\" style=\"flex-basis:66.66%\">\n<p><strong>Hydropower is the most important energy source in Norway. The majority of the hydropower productions comes from the largest hydropower plants, with the largest dams. However, a considerable portion also comes from so-called small-scale power plants. These often have small or no dams, produce less electricity than the large plants, but also leave a smaller footprint on nature.<\/strong><\/p>\n\n\n\n<figure class=\"wp-block-image size-full is-resized\"><img loading=\"lazy\" decoding=\"async\" width=\"613\" height=\"381\" src=\"https:\/\/nr.stage.dekodes.no\/content\/uploads\/sites\/2\/2025\/10\/predikering_smakraftverk.jpg\" alt=\": Illustration of observed and predicted historical streamflow during the spring and summer months, for one of the many river catchments we are working with in the project.\" class=\"wp-image-39065\" style=\"aspect-ratio:1.6089238845144358;width:582px;height:auto\" srcset=\"https:\/\/nr.stage.dekodes.no\/content\/uploads\/sites\/2\/2025\/10\/predikering_smakraftverk.jpg 613w, https:\/\/nr.stage.dekodes.no\/content\/uploads\/sites\/2\/2025\/10\/predikering_smakraftverk-300x186.jpg 300w\" sizes=\"auto, (max-width: 613px) 100vw, 613px\" \/><figcaption class=\"wp-element-caption\">Illustration of observed and predicted historical streamflow during the spring and summer months, <br>for one of the many river catchments we are working with in the project.<\/figcaption><\/figure>\n\n\n\n<p>In this project, we work together with Sm\u00e5kraft, Norway\u2019s largest producer of hydropower from small-scale plants. We develop models for producing reliable predictions of both historical and future water flow in small river catchments, with few or no historical streamflow observations. This can result in better estimates of the hydropower potential for an ungauged river catchment, and improved predictions of how much hydropower will be produced in the future.<\/p>\n\n\n\n<p>This work is part of Climate Futures, which is a Centre for Research-Based Innovation funded by the Research Council of Norway.<\/p>\n<\/div>\n\n\n\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\" style=\"flex-basis:33.33%\">\n<p><strong>To learn more about our work in this project, please contact:<\/strong><\/p>\n\n\n\t\t<div id=\"post-type-multi-block_fe5ff275f12c8895f91a0e1501c8d707\" class=\"wp-block-post-type-multi type-manual style-card-bc_employee t2-grid\">\n\t\t\t\t\t\t\t<div class=\"t2-grid-item-col-6\">\n\t\t\t\t\t\t<a href=\"https:\/\/nr.stage.dekodes.no\/en\/employees\/silius-mortensonn-vandeskog\/\" class='card-employee'>\n\t\t\t\t\t<figure>\n\t\t\t\t<img decoding=\"async\" src=\"https:\/\/nr.stage.dekodes.no\/content\/uploads\/sites\/2\/2024\/05\/silius-mortensonn-vandeskog-17.jpg\" alt=\"\">\n\t\t\t<\/figure>\n\t\t\t\t<div class=\"card-employee__content\">\n\t\t\t<p class=\"card-employee__name\">Silius Mortens\u00f8nn Vandeskog<\/p>\n\t\t\t\t\t\t\t<p class=\"card-employee__position\">Senior Research Scientist<\/p>\n\t\t\t\t\t\t<svg xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 24 24\" height=\"24\" width=\"24\" class=\"t2-icon t2-icon-arrowforward\" aria-hidden=\"true\" focusable=\"false\"><path d=\"M15.9 4.259a1.438 1.438 0 0 1-.147.037c-.139.031-.339.201-.421.359-.084.161-.084.529-.001.685.035.066 1.361 1.416 2.947 3l2.882 2.88-10.19.02c-8.543.017-10.206.029-10.29.075-.282.155-.413.372-.413.685 0 .313.131.53.413.685.084.046 1.747.058 10.29.075l10.19.02-2.882 2.88c-1.586 1.584-2.912 2.934-2.947 3-.077.145-.085.521-.013.66a.849.849 0 0 0 .342.35c.156.082.526.081.68-.001.066-.035 1.735-1.681 3.709-3.656 2.526-2.53 3.606-3.637 3.65-3.742A.892.892 0 0 0 23.76 12a.892.892 0 0 0-.061-.271c-.044-.105-1.124-1.212-3.65-3.742-1.974-1.975-3.634-3.616-3.689-3.645-.105-.055-.392-.107-.46-.083\"\/><\/svg>\n\t\t<\/div>\n\t<\/a>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\n\n\n<div class=\"wp-block-group has-primary-200-background-color has-background\">\n<p>Project: Streamflow prediction for small-scale hydropower plants<\/p>\n\n\n\n<p>Partners: NORCE, Sm\u00e5kraft<\/p>\n\n\n\n<p>Funding: The Research Council of Norway<\/p>\n\n\n\n<p>Period: 2020 &#8211; 2028<\/p>\n<\/div>\n<\/div>\n<\/div>\n","protected":false},"featured_media":39073,"template":"","meta":{"_acf_changed":false,"_trash_the_other_posts":false,"editor_notices":[],"footnotes":""},"class_list":["post-39063","bc_project","type-bc_project","status-publish","has-post-thumbnail"],"acf":[],"_links":{"self":[{"href":"https:\/\/nr.stage.dekodes.no\/en\/wp-json\/wp\/v2\/bc_project\/39063","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/nr.stage.dekodes.no\/en\/wp-json\/wp\/v2\/bc_project"}],"about":[{"href":"https:\/\/nr.stage.dekodes.no\/en\/wp-json\/wp\/v2\/types\/bc_project"}],"version-history":[{"count":5,"href":"https:\/\/nr.stage.dekodes.no\/en\/wp-json\/wp\/v2\/bc_project\/39063\/revisions"}],"predecessor-version":[{"id":39105,"href":"https:\/\/nr.stage.dekodes.no\/en\/wp-json\/wp\/v2\/bc_project\/39063\/revisions\/39105"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/nr.stage.dekodes.no\/en\/wp-json\/wp\/v2\/media\/39073"}],"wp:attachment":[{"href":"https:\/\/nr.stage.dekodes.no\/en\/wp-json\/wp\/v2\/media?parent=39063"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}